Home | PMSIP | Infrastructure Sub Projects | Planning | Performance Management System | Trainings | Complaint Tracking System

 
 
Partner TMAs
Events
Newsletters
Downloads
 
Procurement
 

Infrastructure Sub-Projects

Infrastructure component of PMSIP in its broad view is aimed at:

  • Improvement of existing infrastructure of municipal services that are presently having low/poor service delivery level. It would be done in partnership with selected TMAs, once determined that the particular service carries top priority for the residents of that urban locality.

  • Extension of existing services to newly developed settlements of the town while maintaining a high level of service delivery.

  • Provision of infrastructure in the urban locality where it does not exist at all, and is a priority of the people.

The general criteria for project selection are:

  • Need of the town for such projects

  • Rational Public Demand

  • Integration with other infrastructure projects

  • Financial capacity of TMA to contribute 15% counter part share

  • TMAs’ technical capacity to handle such projects

  • Availability of resources with TMA like land for various components of these projects

  • Existing Coverage of such service to the public and expected income after completion of the projects keeping in view need assessment

  • Political will and acumen

After fulfilling the above mentioned criteria, most needed and priority projects are selected.

 

Click on the name of a TMA for detail of infrastructure sub-project being carried out  by PMDFC

1.   Ahmad Pur Sial

3.   Bhalwal

5.   Chiniot

7.   Dunyapur                 

9.   Hazro                          

11. Kasur

13. Liaqatpur

15. Mailsi

17. Sambrial

19. Toba Tek Singh

2.   Attock 

4.   Chakwal

6.   Daska

8.   Fateh Jang

10. Jhelum

12. Kot Moman

14. Lodhran

16. Pind Dadan Khan

18. Shorkot

 

 

About Us | Contact Us | Links | Jobs

 
All Rights Reserved For www.pmdfc.org.pk 2007