Abstract of Sub-Projects
Ahmad Pur Sial
Name of
Sub Project
|
: |
Improvement of Road
|
Location
|
: |
Ahmad Pur
Sial |
Type of
Surfacing
|
: |
2” Thick
Asphalt Concrete
|
Length of
Roads
|
: |
2.45 |
Km |
|
Approved Cost
(Rs.) |
: |
88.36 |
Million |
|
Implementation Period |
: |
12 |
Month |
Existing Situation:
Present
condition of main road passing through the town is
very poor; dusty, broken surfaces, pot holes, are
causing inconvenience to commuters / public.
Moreover, the present situation is cause of
traffic hindrance and environmental pollution
which is ultimately affecting the health of the
people.
Description of Sub Project:
The sub project is a road which starts from
T-Junction of Muzaffar Garh-Khushab Road and ends
at Ghadeer Chowk. The road length is 8045 feet
(2.45 km).
Sub
Project Benefits:
The
completion of the project will result in the
following benefits:
-
Good road
surfaces will be available to the public, which
will improve the environment of the town;
-
The commercial
activities and business in the town will be
improved as people feel ease in reaching bazaars
which are connected to these streets.
-
Public mental
tension, frustration will be minimized.
The