Abstract of Sub-Projects Dunyapur
Name of Sub
Project
|
: |
Improvement
of Streets
|
Location
|
: |
Dunya Pur Town |
Type of
Surfacing
|
: |
Concrete
Pavers
|
Length of
Streets
|
: |
9.31
km |
|
Approved Cost
(Rs.) |
: |
29.99 Million |
|
Implementation
Period |
: |
12 Month |
Existing Situation:
Present condition of streets is very poor; dusty,
broken brick paved streets are causing
inconvenience to public. Moreover, the present
situation is cause of environmental pollution
which ultimately is affecting the health of the
people.
Description of Sub Project:
Under
this sub project 68 streets shall be paved using
concrete pavers. The proposed sub project has been
planned for at least 20-years; the interlocking
Concrete Pavers have even far more service life.
Sub Project Benefits:
-
Good Street surfaces will
be available to the public, which will improve
the environment of the town.
-
The difficulties and
problems faced by pedestrians during movement on
street will be eliminated.
-
The commercial activities
and businesses in the town will be improved as
people feel ease in reaching bazaars which are
connected to these streets.
-
Public mental tension,
frustration will be minimized.
-
The Town will have a
better look.