Abstract of Sub-Projects
Pind Dadan Khan
Name of Sub
Project
|
: |
Widening
&Improvement of Road
|
T.M.A
|
: |
P.D.Khan |
Length of
Roads
|
: |
1.45 Km |
|
Approved Cost (Rs.)
|
: |
30.42 Million |
|
Implementation Period |
: |
6 Month |
Existing Situation:
The roads in P.D.Khan are in
a state of serious disrepair. Infrequent
maintenance and improper roadside drainage causes
immense difficulties to pedestrians and
transporters during rainy season. The rainwater
finds no outlet and accumulates on these roads
which results in erosion and deterioration of
these roads.
Moreover, the present
situation is cause of traffic hindrance and
environmental pollution which is ultimately
affecting the health of the people.
Description of Sub
Project:
The sub project is
comprises of 3 roads namely Main Road, Railway
Road, Shahid Shaheed Road, and Main Bazar. Two
roads will be surfacing as 1” TST while Main Bazar
will be paved using concrete pavers. Walk ways and
storm water drains will be provided on both sides.
Sub Project Benefits:
The completion of the
project will result in the following benefits:
-
Good road surfaces will be
available to the public, which will improve the
environment of the town;
-
The commercial activities
and business in the town will be improved as
people feel ease in reaching bazaars which are
connected to these streets.
-
Public mental tension,
frustration will be minimized.
The town will have a better
look.