Abstract of Sub-Projects Shorkot
Name of
Sub Project
|
: |
Widening
&Improvement of Road
|
T.M.A
|
: |
Shorkot |
Length of
Roads
|
: |
3.76 Km |
|
Approved Cost
(Rs.) |
: |
57.02 Million |
|
Implementation Period |
: |
12 Month |
Existing Situation:
The
roads in Shorkot are in a state of serious
disrepair. Infrequent maintenance and improper
roadside drainage causes immense difficulties to
pedestrians and transporters during rainy season.
The rainwater finds no outlet and accumulates on
these roads which results in erosion and
deterioration of these roads.
Moreover, the present situation is cause of
traffic hindrance and environmental pollution
which is ultimately affecting the health of the
people.
Description of Sub Project:
The sub project is comprises of 6 roads namely Old
Jhang Road, Old Lorry Adda Road, Shahid Shaheed
Road, Bhirr Road, Madrissa Islamia Road and Main
Bazar. Five roads will be surfacing as 1” TST
while Main Bazar will be paved using concrete
pavers. Walk ways and storm water drains will be
provided either on one side or both sides as per
site condition.
Sub
Project Benefits:
The
completion of the project will result in the
following benefits:
-
Good road
surfaces will be available to the public, which
will improve the environment of the town;
-
The commercial
activities and business in the town will be
improved as people feel ease in reaching bazaars
which are connected to these streets.
-
Public mental
tension, frustration will be minimized.
-
The town will
have a better look.